ALSTOM has been ever
increasingly present in Egypt since mid -19th century. Through its Power &
Transport sectors and its international and local partners, ALSTOM has
contributed to the development of Egypt's infrastructure in a significant way.
To name a few projects, the following references speak for themselves:
|
 |
| 1947 |
27 Diesel locomotives for the Egyptian National Railways (ENR) |
| 1975 |
Turnkey for Abu Qir Thermal Power Plant (4 x 150 MW) |
| 1978 |
Signalling of Arab El Ram-Alexandria segment of Cairo-Alexandria line (ENR)
|
| 1981 |
Turnkey for the Signalling & Centralized Control Equipment, and for the
Products & Services of the Electromechanical scope of Cairo Metro Line 1
(as leader of INTERINFRA Consortium) |
| 1982 & 1984 |
Three-car metro trainsets for Cairo Metro Line 1: 52 & 48 units |
| 1987 |
Turnkey for Abu Qir Thermal Power Plant (1 x 300 MW) |
| 1989 |
Steam Turbine Generators for Damietta (3 x 136 MW) Combined Cycle Power
Plant (CCPP) |
| 1989 |
Modernisation and fitting of the National Authority for Tunnels
workshops (NAT) of Tura
|
| 1990 |
Supply of Equipment, Tools & Machinery and Technical Assistance for
the 10th of Ramadan Boilers Parts' Workshop of the Egyptian Electricity
Authority
|
| 1992, 1995, 1997 |
Signalling & Telecommunications for Cairo Metro Line 2, Phases I
& II
|
| 1999 |
Maintenance of Traffic Centralized Control Systems and Traction/Energy
Centralized Control Systems of Cairo Metro Line 1
|
| 2000 |
Steam Turbines for Sidi Krir 3 & 4 (2 x 325 MW) Thermal Power Plant
(BOT)
|
| 2001 |
30 Shunting Locomotives for ENR
|
| 2003 |
Rehabilitation of Aswan High Dam Power Plant's Instrumentation and
Control for 12 x 175 MW Hydro Turbines
|
| 2004 |
Maintenance of Air treatment, Dewatering & Smoke Exhaust Systems for
Cairo Metro Lines 1 & 2
|
| 2004 |
Four Heat Recovery Steam Generators for Nubareya I & II (2 x 750 MW)
CCPP
|
| 2004 |
Rewinding of 4 generator stators at Abu Qir Thermal Power Plant (4 x 150
MW)
|
| 2007 |
Steam Turbine Generator & Auxiliaries for Cairo North II (3 x 250
MW) CCPP
|
| Under execution: |
Steam Turbine Generator & Auxiliaries for New Talkha (3 x 250 MW)
CCPP
Steam Turbine Generators & Condensers for El Tebbin (2 x 350 MW) Thermal PP
Steam Turbine Generator & Auxiliaries for El Kureimat III (3 x 250 MW) CCPP
Steam Turbine Generator & Condenser for Nubareya III (3 x 250 MW) CCPP
|
ALSTOM Power is also currently executing technical supervision, supply
of spare parts, major overhaul and rehabilitation at different public and
private power plants (steam turbines, generators, boilers).
ALSTOM Transport Sector is carrying out since 2005 with the Egyptian Co.
for the Metro Management & Operation ( ECMMO), previously Cairo Metro
Organization, a contract for the Maintenance of Signalling Driving Modes
Centralized Control Equipment for Metro Line 2.
In the framework of the Cairo Metro Line 3 Phase I project , Transport Sector
signed in 2007 with NAT, as Consortium leader with Thales, the contract for the
Signalling & Telecommunications; and as a member in the Consortium Colas
Rail, Thales, Orascom and Arab Contractors, the contract for the
Electromechanical works. Latest contract signed was with ECMMO for the
Renovation of 52 trains of Cairo Metro Line1.
ALSTOM Transport continues to deliver products and services to its main
customers, ENR, NAT and ECMMO, to assist them in operation and maintenance
services. |
|
|
|
|