Abu Qir thermal power plant in Egypt


Abu Qir thermal power plant in Egypt: sunset

Related Content:
Access
www.power.alstom.com
More Case Studies

Abu Qir Thermal Power Plant Case Study
  • Abu Qir Thermal Power Plant is equipped with five steam turbine generators of a total output of 900 MW.
  • The contract for units 1-4 was signed in 1979 introducing the 150 MW units into the Egyptian electricity market.
  • Units 1-4 were commissioned in 1983 - 1984 as the first highest rating units in the Unified Power System of Egypt.
  • It is the first Power Plant built as "Environment-Friendly" Power Plant; introduced the Dual Firing Burners concept.
  • Early in 1989, the contract for unit 5 (1x300 MW) was signed. The commissioning was in 1991.

Technical data:
Units 1- 4:
Turbine:Tandem compound, two cylinders, single reheat type.

Speed 3000 rpm
Rated power output 150 MW
Pressure at HP inlet 155 bar
Temperature at HP inlet 533°C
Steam flows 456 t/h


A/C Generators: Hydrogen cooled type
Rated power 176 MVA
Frequency 50 Hz
Rated voltage 15 kV
Temperature at HP inlet 0.85
Steam flows 98.5%


Unit 5:
Turbine:
Speed 3000 rpm
Gross output 312 MW
Pressure 164 bar
Temperature 538°C


A/C Generator :
Rated power 390 MVA
Power factor 0.8
Frequency 50 Hz
Rated voltage 22 kV