Maintenance traction - Energy centralized control - Metro line 1 power control
point (PCP)

Maintenance of signalling, driving modes and centralized control - Metro Line
2
|
 |
Project Chronology
- October 1996 : Inauguration and timely putting into service of the first
section of Phase 1 of Line 2 from Shubra el Kheima to Mubarak station.
- October 1997 : Inauguration and timely putting into service of the
completed Phase 1 of Line 2 up to Sadat station.
- April 1999 : Inauguration and putting into service 8 months ahead of
schedule of the Phase 2A up to Cairo University station.
- October 2000: Inauguration and putting into service 2 months ahead of
schedule of the Phase 2B up to Giza Suburban station.
ALSTOM has participated in all the project stages for the following systems
:
- Train Workshop Equipment.
- 20 kV AC Supply Equipment.
- 750 V DC Equipment in Rectifier Station and along the line.
- Ventilation and Air Conditioning.
- Centralized Control.
- Power & Alarms Centralized Control.
- Traffic & Traction Centralized Control.
- Signalling and Driving Modes.
- Telecommunications.
Maintenance Contracts
- Traction/Energy Centralized Control for Line 1.
- Ventilation, Air Conditioning and Dewatering for Line 1 & Line 2.
- Maintenance of Traffic Centralized Control for Line 1.
- Maintenance of Signalling, Driving Modes and Centralized Control for Line
2.
- Rehabilitation and Maintenance of the Signalling, ATC and
Telecommunications Systems for Cairo/Alexandria Line.
Activity/Competencies (SYS)
ALSTOM Transport SYS in Egypt is in charge of the execution of Transport
Mass Transit activities in the field of electricity, electronics,
communication, energy engineering related to the above mentioned activities, as
well as the execution of erection works, testing and commissioning,
maintenance, repair services and training for the different type of equipment
and installation related to these activities. |
|
|
|