| Project |
Scope |
Client |
Date |
| Cairo/Alex Line Arab El Raml to Alexandria |
Signalling |
ENR |
1978 |
| Line Cairo - Helwan |
Revamping signalling |
ENR/CMO |
1981 |
| Giza/Beni Suef Line |
Signalling + centralised control |
ENR |
1983 |
| Cairo Metro Line1 |
Signalling of the tunnel from Sadat to Mubarak Stations |
NAT |
1985 |
| Cairo Metro Line Helwan/ El Marg |
Signalling + ATC |
NAT |
1985 |
| Cairo Metro Line 1 |
Centralised control of the Ramses Complex |
NAT |
1989 |
| Cairo Metro line 2 Phase 1A&1B |
Signalling |
NAT |
1992 |
| Cairo Metro line 2 Phase 2 A |
Signalling, centralised control and telecom |
NAT |
1995 |
| Siding Tracks |
Siding Helwan El Marg |
NAT |
1996 |
| Ghamra |
Erection Ghamra station signalling equipment room |
ENR /CMO |
1997 |
| Cairo Metro line 2 Phase 2 B |
Signalling, centralised control, telecom |
NAT |
1997 |
| Giza/Beni Suef Line |
Beni Suef SIG view Train Supervision |
ENR |
1998 |
| El Marg V12 |
El Marg trackside equiment |
ENR /CMO |
1998 |
| Cairo Metro |
Supply of 35 modems TELSAT 1574 |
ENR /CMO |
1999 |
| Cairo Metro Line1 |
Supply of spare parts for signalling |
ENR /CMO |
1999 |
| Cairo Metro Line1 |
Supply of spare parts, centralised control TE14 |
ENR /CMO |
2000 |